Wednesday, January 14, 2026
Caspian Barrel
Advertisement
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • About Us
  • Azərbaycan
  • English
  • Русский
No Result
View All Result
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • About Us
  • Azərbaycan
  • English
  • Русский
No Result
View All Result
Caspian Barrel
No Result
View All Result

Azerbaijan building number of substations in Shusha

29/12/2021
Azerbaijan building number of substations in Shusha
5
VIEWS
Share on FacebookShare on Twitter

Thirty six online inquiries were received in 2021 from Karabakh regarding the connection to the power supply network, Azerishig OJSC told Trend.

According to the general plan of the city of Shusha, it is planned to build nine substations with a capacity of 35 kV each.

It was noted that six of them are under construction, and construction and installation work is being completed at three substations.

“The electrical wires of the substations will be laid underground. For the first time, through these digital control centers, it will be possible to manage data from the substation to the subscriber meter, including meter data, online. Work is also ongoing in Kalbajar, and most military units are already provided with electricity. More than 70 percent of the laying of new 35 kV lines from Gulabird to the Lachin corridor, as well as in the direction of Minkand through the Lachin corridor, has been completed,” the message says.

Tags: AzerenerjiShusha

Related Posts

Azerbaijan to use Italian turbines in construction of large thermal power plant
Azerbaijan

Azerbaijan to use Italian turbines in construction of large thermal power plant

13/02/2023
Modernization of a large thermal power plant will save 800 mcm meteras per year
Azerbaijan

Modernization of a large thermal power plant will save 800 mcm meteras per year

10/11/2022
Bakı Enerji Forumunun bir ssessiyası Şuşada keçiriləcək
Azerbaijan

Azerbaijan to hold closing ceremony of Baku Energy Forum in Shusha

24/05/2022
Energy companies are using more gas to generate electricity
Azerbaijan

Energy companies are using more gas to generate electricity

20/04/2022
Subscribers from the category of population in Shusha announced
Azerbaijan

Subscribers from the category of population in Shusha announced

29/09/2021
Almost 93% of generated electricity in Azerbaijan comes from natural gas
Azerbaijan

Almost 93% of generated electricity in Azerbaijan comes from natural gas

21/06/2021
WTI Crude Price
Brent Crude Price

Vacancy

International Company is looking for a PCS Engineer

08/01/2026
Azerbaijan

The first five years of Azerbaijani gas in European markets

19/12/2025
Vacancy

MHWirth AS is looking for an Overhaul & Modification Manager

22/12/2025
Vacancy

MHWirth AS is looking for a Training, Optimization & Upgrades Manager

22/12/2025
Vacancy

International Company is looking for a Sure Service Engineer

15/12/2025
Vacancy

International Company is looking for a  Crane Focal Point

09/12/2025
Vacancy

International Company is looking for a Crane Operator 

09/12/2025
Vacancy

International Company is looking for a Crane Focal Point

09/12/2025
Vacancy

International Company is looking for a  Crane Reliability Manager

09/12/2025
Vacancy

International Company is looking for a Diesel  Engineer

09/12/2025

No Result
View All Result
  • Azərbaycan
  • English
  • Русский
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • Contact

© 2014 - 2024 CaspianBarrel - Xəzərin neft və qaz xəbələri.