Friday, August 7, 2026
Caspian Barrel
Advertisement
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • About Us
  • Azərbaycan
  • English
  • Русский
No Result
View All Result
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • About Us
  • Azərbaycan
  • English
  • Русский
No Result
View All Result
Caspian Barrel
No Result
View All Result

TAP transports more than 2 bcm of gas since early 2021

18/05/2021
During a month about 638 million cub.m. of gas transported via Southern Caucasian gas pipeline

During a month about 638 million cub.m. of gas transported via Southern Caucasian gas pipeline

9
VIEWS
Share on FacebookShare on Twitter

Trans Adriatic Pipeline (TAP) AG today launches the binding phase of its market test with an information phase, which provides two months lead time until actual bids may be submitted, starting 17 July 2021, Report informs, referring to TAP AG.

The binding phase opens following the approval of the Project Proposal of TAP, the Italian transmission system operator (TSO) Snam Rete Gas (SRG), and the Greek TSO DESFA by the national regulatory authorities of Greece, Albania, and Italy, in May 2021.

The binding phase documents, including the Project Proposal, the Joint Notice of TAP, SRG and DESFA, the Binding Phase Notice of TAP, and the supporting documentation and relevant forms, are available here. Stakeholders and interested parties can submit bids to [email protected] between 17 July and 20 July 2021.

Luca Schieppati, TAP Managing Director, said: “After four and a half months since gas flow via TAP started, we transported more than 2 billion cubic meters of gas and provided safe and reliable transmission services to our shippers.

The possibility to expand TAP’s capacity in stages, in line with the relevant demand and supply, is a significant opportunity, especially for the countries in the South-Eastern Europe region, which could enable them to reach their decarbonisation targets.”

TAP transports natural gas from the giant Shah Deniz field in the Azerbaijan sector of the Caspian Sea to Europe. The 878 km long pipeline connects with the Trans Anatolian Pipeline (TANAP) at the Turkish-Greek border in Kipoi, crosses Greece and Albania and the Adriatic Sea, before coming ashore in Southern Italy.

TAP will facilitate gas supplies to South Eastern European countries through prospective interconnectors. In particular, Bulgaria will be able to cover up to 33% of its total gas demand through TAP after the completion of the Interconnector Greece Bulgaria (IGB). TAP’s exits in Greece and Albania together with the landfall in Italy provide multiple opportunities for further transport of gas from Azerbaijan to the wider European markets.

As a key part of the Southern Gas Corridor, TAP is strategically and economically important to Europe and essential in providing reliable access to a new source of natural gas. TAP plays a significant role in boosting Europe’s energy security, supply diversification, as well as decarbonisation objectives.

TAP’s shareholding is comprised of bp (20%), SOCAR (20%), Snam (20%), Fluxys (19%), Enagás (16%), and Axpo (5%).

Tags: TAP

Related Posts

TAP pipeline hits 50 Bcm milestone in gas exports to Europe
Azerbaijan

TAP pipeline hits 50 Bcm milestone in gas exports to Europe

09/09/2025
Швейцарская AXPO выходит из проекта TAP
İnteresting News

TAP working on concepts for future expansion cases

04/06/2024
IGB operator announces start of binding phase for capacity expansion
İnteresting News

IGB operator announces start of binding phase for capacity expansion

20/05/2024
ТАР-ın qısamüddətli imkanlarına maraq əhəmiyyətli dərəcədə artıb
İnteresting News

35 bcm of Azerbaijani gas have already been transported through the TAP pipeline

18/05/2024
Greek Ambassador to Azerbaijan on the role of the TAP gas pipeline
Azerbaijan

Greek Ambassador to Azerbaijan on the role of the TAP gas pipeline

03/04/2024
По «Северному потоку-1» в Европу поставлено 441 млрд кубов газа
İnteresting News

Interconnector Greece-Bulgaria supplies over 962 mcm of gas

30/05/2023
WTI Crude Price
Brent Crude Price

Vacancy

International Company is looking for a Project Manager

29/07/2026
Vacancy

International Company is looking for a Team lead

29/07/2026
Kateqoriyasız

EnerMech OGP is looking for a Crane Operator 

27/07/2026
Vacancy

PD&MS Group is looking for a Construction Delivery Lead (Baku)

27/07/2026
Azerbaijan

GL Group Appoints Farid Baghirov as Group Vice-President of Commercial and Business Development

23/07/2026
Azerbaijan

GL Group Announces Establishment of U.S. Presence and Appointment of Executive Vice President, North America

23/07/2026
Azerbaijan

GL Group Signs Strategic Cooperation Services Agreement with Baker Hughes

23/07/2026
Azerbaijan

Historic Milestone: GL Group Becomes the First Azerbaijani Company to Acquire Four Oil and Gas Assets in the United States

23/07/2026
Vacancy

Wood Nobel Energy is looking for an Engineering Manager

27/07/2026
Vacancy

PD&MS Group is looking for a Senior Project Engineer

14/07/2026

No Result
View All Result
  • Azərbaycan
  • English
  • Русский
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • Contact

© 2014 - 2024 CaspianBarrel - Xəzərin neft və qaz xəbələri.