Sunday, August 16, 2026
Caspian Barrel
Advertisement
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • About Us
  • Azərbaycan
  • English
  • Русский
No Result
View All Result
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • About Us
  • Azərbaycan
  • English
  • Русский
No Result
View All Result
Caspian Barrel
No Result
View All Result

TAP Launches offshore construction works in Albania

22/10/2018
TAP Launches offshore construction works in Albania
16
VIEWS
Share on FacebookShare on Twitter
On 19 October 2018, the Trans Adriatic Pipeline (TAP) marked the start of construction works for the 105km offshore pipeline section. The physical offshore pipeline installation is planned to be carried out in 2019, as per TAP’s schedule.

The milestone was celebrated in a ceremony attended by Edi Rama, the Prime Minister of Albania, Damian Gjiknuri, the Minister of Infrastructure and Energy, Armando Subashi, the Mayor of Fier, as well as TAP’s Management. Participants also included representatives of local authorities, diplomatic corps and other key stakeholders.

Prime Minister Rama and TAP Managing Director Schieppati drew the offshore section of the pipeline on a map, symbolising the soon to be completed section of the project for Albania.

Prime Minister Rama and Minister Gjiknuri both welcomed the project’s good progress, the benefits it brings to local communities and underlined the strong partnership between TAP and Albania. They also emphasised TAP’s strategic importance.

TAP Managing Director Luca Schieppati said: “This is another key milestone taking one more step towards completion of the TAP project and the start of operations in 2020. Being one of the most strategic and mature infrastructure projects currently implemented in Europe, TAP will bring a new source of gas to homes and business and boost security of energy supply in the region. Overall, our project is more than 80% complete and we are proud that works are being undertaken in line with the highest standards and industry best practice.”

TAP Project Director John Haynes added: “This is the first time for engineering works of such a scale and magnitude to be carried out in Albania. Steel pipes will be welded together on board state-of-the-art vessels, which will be located at sea. These welds are then tested, and the pipeline is lowered down onto the seabed, reaching depths of more than 810m beneath sea level. Approximately 9,000 pipes with a 36-inch diameter will be used, weighing approximately 100,000 tonnes in total.”

TAP’s Country Manager Albania Malfor Nuri thanked the Albanian government for their support: “In our journey we have created strong and long-term relations with the communities along TAP’s route in Albania. These are based on transparency and trust and we are very proud of our investments in social and environmental projects that aim to improve the quality of life of local communities. Not only is TAP one of the largest foreign direct investments in Albania; it is one of the most important energy projects for the country, amounting to about €1.5 billion.”

Saipem is TAP’s contractor in charge of the engineering, procurement, construction and installation of the offshore section of the project. Approximately 10 vessels will be used for the offshore construction: two vessels will lay pipes and specialized vessels will be used for dredging, supplying pipes, light construction, anchor handling, towing and survey activities. A semi-submersible pipe laying vessel will install pipes in deep waters and a shallow water lay barge will be used closer to the shore.

Tags: Albania offshoreDamian GjiknuriEdi RamaPrime Minister Rama and TAP Managing Director SchieppatiTAPthe Prime Minister of Albania

Related Posts

TAP pipeline hits 50 Bcm milestone in gas exports to Europe
Azerbaijan

TAP pipeline hits 50 Bcm milestone in gas exports to Europe

09/09/2025
Швейцарская AXPO выходит из проекта TAP
İnteresting News

TAP working on concepts for future expansion cases

04/06/2024
IGB operator announces start of binding phase for capacity expansion
İnteresting News

IGB operator announces start of binding phase for capacity expansion

20/05/2024
ТАР-ın qısamüddətli imkanlarına maraq əhəmiyyətli dərəcədə artıb
İnteresting News

35 bcm of Azerbaijani gas have already been transported through the TAP pipeline

18/05/2024
Greek Ambassador to Azerbaijan on the role of the TAP gas pipeline
Azerbaijan

Greek Ambassador to Azerbaijan on the role of the TAP gas pipeline

03/04/2024
По «Северному потоку-1» в Европу поставлено 441 млрд кубов газа
İnteresting News

Interconnector Greece-Bulgaria supplies over 962 mcm of gas

30/05/2023
Please login to join discussion
WTI Crude Price
Brent Crude Price

Vacancy

International Company is looking for a Project Manager

29/07/2026
Vacancy

International Company is looking for a Team lead

29/07/2026
Kateqoriyasız

EnerMech OGP is looking for a Crane Operator 

27/07/2026
Vacancy

PD&MS Group is looking for a Construction Delivery Lead (Baku)

27/07/2026
Azerbaijan

GL Group Appoints Farid Baghirov as Group Vice-President of Commercial and Business Development

23/07/2026
Azerbaijan

GL Group Announces Establishment of U.S. Presence and Appointment of Executive Vice President, North America

23/07/2026
Azerbaijan

GL Group Signs Strategic Cooperation Services Agreement with Baker Hughes

23/07/2026
Azerbaijan

Historic Milestone: GL Group Becomes the First Azerbaijani Company to Acquire Four Oil and Gas Assets in the United States

23/07/2026
Vacancy

Wood Nobel Energy is looking for an Engineering Manager

27/07/2026
Vacancy

PD&MS Group is looking for a Senior Project Engineer

14/07/2026

No Result
View All Result
  • Azərbaycan
  • English
  • Русский
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • Contact

© 2014 - 2024 CaspianBarrel - Xəzərin neft və qaz xəbələri.