Friday, May 15, 2026
Caspian Barrel
Advertisement
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • About Us
  • Azərbaycan
  • English
  • Русский
No Result
View All Result
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • About Us
  • Azərbaycan
  • English
  • Русский
No Result
View All Result
Caspian Barrel
No Result
View All Result

BP deploys new digital tool in the Caspian

18/08/2021
BP deploys new digital tool in the Caspian
8
VIEWS
Share on FacebookShare on Twitter

BP recently launched a three-dimensional (3D) visualization tool on the East Azeri and West Chirag platforms, commencing the first phase of the digital modelling of all its assets in the region, Report informs, referring to bp-Azerbaijan.

The new tool allows to perform some of the important offshore activities such as inspection, planning, and verification via remote use of high-definition images with measurement capabilities. It also offers virtual walkthroughs and enables teams to visit assets remotely, which, in turn, leads to the simplification of several operational processes, optimization of time and cost, improvements in safety, and stronger collaboration.

To prepare the 3D digital model of the East Azeri platform – the first-ever 3D model of a bp-operated facility in the Caspian – the photogrammetric survey and preparation of the platform spherical images were completed with the final images processed and uploaded into the tool for further use.

Elkhan Mamedov, vice president of production, Azerbaijan, Georgia, Turkey region: “This is a fantastic achievement by the project team which puts our operations in the region at the forefront of technology and digital transformation. The possibilities of using the 3D visualization tool are huge. Today, it helps us to be more efficient in our planning and execution whilst ensuring safe ongoing operations. In future, it will enable us to further enhance personal safety by reducing the need for onsite activities.”

bp plans to complete the 3D visualization modelling of all ACG offshore facilities by the end of 2021 with a view to deploy the tool on the remaining bp-operated offshore facilities in the region and at the Sangachal terminal in the next few years.

The deployment of the 3D visualization tool marks the first step in the implementation of the multi-phased ‘Digital Twin’ project. The ‘Digital Twin’ is a virtual representation of an object or a system that spans its lifecycle and uses simulation, machine learning, and reasoning to help decision-making, remote work preparation, and execution.

Tags: BP

Related Posts

С начала года по ВТС прокачено 4,8 млн тонн центрально-азиатской нефти
Azerbaijan

BP in talks to transfer pipeline operator role to Azerbaijan, Georgia, and Türkiye

08/12/2025
Pressure on BP to merge with Shell and create a British oil giant
İnteresting News

Pressure on BP to merge with Shell and create a British oil giant

17/02/2025
KİV: BP bərpa olunan enerji mənbələrinin tətbiqini ləngidir
İnteresting News

BP halts hiring, slows renewables roll-out to win over investors

27/06/2024
Table of oil production volumes at Azeri-Chirag-Guneshli
İnfographics

Table of oil production volumes at Azeri-Chirag-Guneshli

13/05/2024
ExxonMobil son 32 ildə ilk dəfə rübü zərərlə başa vurdu
İnteresting News

Exxon beats estimates, ends 2023 with a $36 billion profit

04/02/2024
130 bcm of gas have already been exported from the Caspian Shah Deniz field
Azerbaijan

Within the framework of the “Shah Deniz” project, production has not increased, but costs have increased by 12%

04/08/2023
WTI Crude Price
Brent Crude Price

Kateqoriyasız

SOCAR completes acquisition of Italiana Petroli

12/05/2026
Azerbaijan

Azerbaijan, BP discuss new areas of cooperation

12/05/2026
Vacancy

International Company is looking for an Operations Engineer

07/05/2026
Azerbaijan

Amirbayov: Azerbaijan ready to double gas exports to EU, but investment in supply infrastructure needed

04/05/2026
Vacancy

“Stork APM Consultancy Services” LLC is looking for a Senior Consultant

30/04/2026
Vacancy

International Company is looking for a Laboratory Director

30/04/2026
Vacancy

International Company is looking for a Laboratory Specialist (Commissioning)

30/04/2026
Vacancy

International Company is looking for a Process Director

30/04/2026
Vacancy

PD&MS Group is looking for a Senior Electrical Designer

18/04/2026
Vacancy

PD&MS Group is looking for a Senior E&I Work Pack Engineer (Baku)

18/04/2026

No Result
View All Result
  • Azərbaycan
  • English
  • Русский
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • Contact

© 2014 - 2024 CaspianBarrel - Xəzərin neft və qaz xəbələri.