Thursday, October 8, 2026
Caspian Barrel
Advertisement
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • About Us
  • Azərbaycan
  • English
  • Русский
No Result
View All Result
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • About Us
  • Azərbaycan
  • English
  • Русский
No Result
View All Result
Caspian Barrel
No Result
View All Result

Work started for an ACG deep gas appraisal well

23/01/2023
Work started for an ACG deep gas appraisal well
29
VIEWS
Share on FacebookShare on Twitter

Operational activities have started in preparation for spudding a new appraisal well on the Azeri-Chirag-Gunashli structure. The well is for acquiring data about the deep-lying gas reservoirs beneath the currently producing oil field.

The A22z well will be drilled from the Chirag platform as a sidetrack from the existing A22 injector well. It will target to reach deep gas reservoirs in the south flank location of the structure.  

It is planned to drill the well to a total depth of around 4,500 metres.
If successful, the new data acquired from the well will help increase the structural understanding of the area and the pressures in the deep reservoirs.

It will take approximately three months to drill the well, and an extensive logging programme will take place prior to installing gauges to measure pressure data.

BP-Azerbaijan

Tags: ACG deep gasBP Azerbaijan

Related Posts

Azərbaycan bp ilə enerji və rəqəmsal infrastruktur üzrə sənədlər imzalayıb
Azerbaijan

Azerbaijan, BP discuss new areas of cooperation

12/05/2026
bp: “Dünyaya illərlə karbohidrogen lazımdır, Xəzər bu məsələdə əsas rol oynaya bilər”
Azerbaijan

Giovanni Cristofoli: World needs hydrocarbons for decades to come

26/11/2025
bp: nearly $6 billion invested in BTC project
Azerbaijan

bp: nearly $6 billion invested in BTC project

29/04/2025
“Mərkəzi Azəri” platformasından 20 ilə 1,1 mlrd barel neft hasil edilib
Azerbaijan

Central Azeri celebrates 20 years of production

18/02/2025
Алиев: добыча газа в рамках проекта “Шахдениз-3” может начаться в течение 4 лет
Azerbaijan

BP expects first low-pressure gas from Shah Deniz field in mid-2029

28/01/2025
A new platform is planned to be built at the “Shah Deniz” field
Azerbaijan

A new platform is planned to be built at the “Shah Deniz” field

27/01/2025
WTI Crude Price
Brent Crude Price

Vacancy

International company is looking for a HSE and Sustainability New Initiatives Support Lead

06/10/2026
Vacancy

International Company is looking for an Offshore Interface Lead

04/10/2026
Vacancy

International Company is looking for a Process Director

04/10/2026
Vacancy

International Company is looking for a Maintenance Specialist

04/10/2026
Vacancy

International company is looking for a Process Lead

04/10/2026
Vacancy

International Company is looking for a Production Manager

04/10/2026
Vacancy

PD&MS Group is looking for a Construction Manager

18/09/2026
Vacancy

PD&MS Group is looking for an Offshore Construction Engineer (OCE)

18/09/2026
Vacancy

PD&MS Group is looking for a Rigger – L3 Rope Access (Baku)

18/09/2026
Vacancy

International Company is looking for a Principal Instrument Engineer

20/09/2026

No Result
View All Result
  • Azərbaycan
  • English
  • Русский
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • Contact

© 2014 - 2024 CaspianBarrel - Xəzərin neft və qaz xəbələri.