Monday, August 10, 2026
Caspian Barrel
Advertisement
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • About Us
  • Azərbaycan
  • English
  • Русский
No Result
View All Result
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • About Us
  • Azərbaycan
  • English
  • Русский
No Result
View All Result
Caspian Barrel
No Result
View All Result

Technical maintenance on West Azeri platform completed

06/05/2021
Technical maintenance on West Azeri platform completed
27
VIEWS
Share on FacebookShare on Twitter

The 15-day scheduled technical maintenance program launched on April 22 this year on the West Azeri platform has been successfully completed, BP Azerbaijan told Report.

Inspection and design work envisaged by the program was successfully completed on May 4.

Production from the platform has been resumed. The gradual bringing of production to normal levels continues as planned.

Tags: BP Azerbaijan

Related Posts

Azərbaycan bp ilə enerji və rəqəmsal infrastruktur üzrə sənədlər imzalayıb
Azerbaijan

Azerbaijan, BP discuss new areas of cooperation

12/05/2026
bp: “Dünyaya illərlə karbohidrogen lazımdır, Xəzər bu məsələdə əsas rol oynaya bilər”
Azerbaijan

Giovanni Cristofoli: World needs hydrocarbons for decades to come

26/11/2025
bp: nearly $6 billion invested in BTC project
Azerbaijan

bp: nearly $6 billion invested in BTC project

29/04/2025
“Mərkəzi Azəri” platformasından 20 ilə 1,1 mlrd barel neft hasil edilib
Azerbaijan

Central Azeri celebrates 20 years of production

18/02/2025
Алиев: добыча газа в рамках проекта “Шахдениз-3” может начаться в течение 4 лет
Azerbaijan

BP expects first low-pressure gas from Shah Deniz field in mid-2029

28/01/2025
A new platform is planned to be built at the “Shah Deniz” field
Azerbaijan

A new platform is planned to be built at the “Shah Deniz” field

27/01/2025
WTI Crude Price
Brent Crude Price

Vacancy

International Company is looking for a Project Manager

29/07/2026
Vacancy

International Company is looking for a Team lead

29/07/2026
Kateqoriyasız

EnerMech OGP is looking for a Crane Operator 

27/07/2026
Vacancy

PD&MS Group is looking for a Construction Delivery Lead (Baku)

27/07/2026
Azerbaijan

GL Group Appoints Farid Baghirov as Group Vice-President of Commercial and Business Development

23/07/2026
Azerbaijan

GL Group Announces Establishment of U.S. Presence and Appointment of Executive Vice President, North America

23/07/2026
Azerbaijan

GL Group Signs Strategic Cooperation Services Agreement with Baker Hughes

23/07/2026
Azerbaijan

Historic Milestone: GL Group Becomes the First Azerbaijani Company to Acquire Four Oil and Gas Assets in the United States

23/07/2026
Vacancy

Wood Nobel Energy is looking for an Engineering Manager

27/07/2026
Vacancy

PD&MS Group is looking for a Senior Project Engineer

14/07/2026

No Result
View All Result
  • Azərbaycan
  • English
  • Русский
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • Contact

© 2014 - 2024 CaspianBarrel - Xəzərin neft və qaz xəbələri.