Tuesday, August 18, 2026
Caspian Barrel
Advertisement
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • About Us
  • Azərbaycan
  • English
  • Русский
No Result
View All Result
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • About Us
  • Azərbaycan
  • English
  • Русский
No Result
View All Result
Caspian Barrel
No Result
View All Result

Pipelay of the Nord Stream 2 Pipeline starts in Finland

06/09/2018
Pipelay of the Nord Stream 2 Pipeline starts in Finland
22
VIEWS
Share on FacebookShare on Twitter

The offshore pipelay vessel Solitaire started today at 13:25 CEST the pipelay for the Nord Stream 2 natural gas pipeline in the Gulf of Finland.

Before the start of pipelay, the vessel was equipped and tested to meet the project’s strict requirements. Nord Stream 2’s construction plan takes into consideration different construction conditions, in particular environmental requirements. Solitaire for example uses a dynamic positioning system with thrusters to position itself accurately. It is thus only the pipeline that touches the seabed. Using a vessel operating without anchors ensures additional safety in the congested Gulf of Finland.

Solitaire is a 300 metres long and 41 metres wide vessel that will lay pipes around the clock seven days a week. The vessel has accommodation on board for 420 persons. Pipe supply vessels (PSV’s) will deliver the 12-metre, 24-tonne pipes used to build Nord Stream 2 to the pipelay vessel from the project’s nearest logistics hubs, such as Kotka or Hanko, to maintain the necessary pipe stock.

The pipes are welded together on board the vessel, then welds are tested and finally the pipeline is lowered down to the seabed. A survey vessel will perform surveys prior to and after pipelay to verify that the pipeline is located at its correct position.

The safety zone around the pipelay vessel is 1,85 kilometres (1 nautical mile) and around the survey vessels Oceanic and Olympic Triton 500 metres (0,3 nautical miles). Information to seafarers on potential navigation restrictions can be found in real-time in the Notices to Mariners, NAVTEX (Navigational Telex) and VHF-radio. All safety operations within the Finnish EEZ have been agreed in cooperation with the Finnish Transport Agency and Border Guard. Pipelay works are carried out in compliance with the national permit provisions and overseen by the national authorities.

Nord-stream2.com

 

Tags: Nord Stream 2 nГазпром

Related Posts

Finland’s Gasum terminates Gazprom pipeline gas contract
Russia

Finland’s Gasum terminates Gazprom pipeline gas contract

22/05/2023
“Gazprom” reduced exports to non-CIS countries by 44.5 percent
Russia

“Gazprom” reduced exports to non-CIS countries by 44.5 percent

05/12/2022
Gazprom’s production fell by 36 bcm in seven months
Russia

Gazprom’s production fell by 36 bcm in seven months

03/08/2022
Молдавия начнет закупать российский газ по повышенной цене
Russia

In July, Moldova will buy Russian gas for $980

01/07/2022
Gazprom supplying 46.1 mcm of gas to Europe via Ukraine
Russia

Gazprom supplying 46.1 mcm of gas to Europe via Ukraine

24/05/2022
Bulgaria suspending gas imports from Gazprom Export
İnteresting News

Bulgaria suspending gas imports from Gazprom Export

27/04/2022
Please login to join discussion
WTI Crude Price
Brent Crude Price

Vacancy

International Company is looking for a Project Manager

29/07/2026
Vacancy

International Company is looking for a Team lead

29/07/2026
Kateqoriyasız

EnerMech OGP is looking for a Crane Operator 

27/07/2026
Vacancy

PD&MS Group is looking for a Construction Delivery Lead (Baku)

27/07/2026
Azerbaijan

GL Group Appoints Farid Baghirov as Group Vice-President of Commercial and Business Development

23/07/2026
Azerbaijan

GL Group Announces Establishment of U.S. Presence and Appointment of Executive Vice President, North America

23/07/2026
Azerbaijan

GL Group Signs Strategic Cooperation Services Agreement with Baker Hughes

23/07/2026
Azerbaijan

Historic Milestone: GL Group Becomes the First Azerbaijani Company to Acquire Four Oil and Gas Assets in the United States

23/07/2026
Vacancy

Wood Nobel Energy is looking for an Engineering Manager

27/07/2026
Vacancy

PD&MS Group is looking for a Senior Project Engineer

14/07/2026

No Result
View All Result
  • Azərbaycan
  • English
  • Русский
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • Contact

© 2014 - 2024 CaspianBarrel - Xəzərin neft və qaz xəbələri.