Tuesday, October 13, 2026
Caspian Barrel
Advertisement
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • About Us
  • Azərbaycan
  • English
  • Русский
No Result
View All Result
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • About Us
  • Azərbaycan
  • English
  • Русский
No Result
View All Result
Caspian Barrel
No Result
View All Result

No gas flare in Parsi oil field

01/05/2018
No gas flare in Parsi oil field
20
VIEWS
Share on FacebookShare on Twitter

Iran’s private sector has launched a station at Parsi Oilfield to collect associated gases and prevent their burning at flare stacks.

The station prevents burning of at least 3 mcf/d and at most 7.5 mcf/d of natural gas at flare stacks of Parsi Complex, Aghajari Operational District.

Operated by Tamkar Gas Company, this is the first such project to reach fruition by the Iranian private sector which has launched a gas pressure station with 7.5 mcf/d of capacity.

The station receives low-pressure gas from Parsi Field and injects to operating wells.

The facility was inaugurated on Saturday in a ceremony that was held in the presence of Bijan Alipour, CEO of the National Iranian South Oil Company (NISOC).

Shana.ir

 

Tags: associated gaseBijan AlipourNational Iranian South Oil CompanyParsi Oilfield

Related Posts

NISOC готова к добыче более 3 млн. баррелей сырой нефти в день
Iran

Sanctions not affecting Iran oil output: NISOC

15/06/2018
NISOC, Pergas Sign HOA for Developing Iran Oilfield
Iran

NISOC, Pergas Sign HOA for Developing Iran Oilfield

17/05/2018
Rag-Sefid still burning despite killing operations
Iran

Rag-Sefid still burning despite killing operations

26/12/2017
Please login to join discussion
WTI Crude Price
Brent Crude Price

Vacancy

International company is looking for a HSE and Sustainability New Initiatives Support Lead

06/10/2026
Vacancy

International Company is looking for an Offshore Interface Lead

04/10/2026
Vacancy

International Company is looking for a Process Director

04/10/2026
Vacancy

International Company is looking for a Maintenance Specialist

04/10/2026
Vacancy

International company is looking for a Process Lead

04/10/2026
Vacancy

International Company is looking for a Production Manager

04/10/2026
Vacancy

PD&MS Group is looking for a Construction Manager

18/09/2026
Vacancy

PD&MS Group is looking for an Offshore Construction Engineer (OCE)

18/09/2026
Vacancy

PD&MS Group is looking for a Rigger – L3 Rope Access (Baku)

18/09/2026
Vacancy

International Company is looking for a Principal Instrument Engineer

20/09/2026

No Result
View All Result
  • Azərbaycan
  • English
  • Русский
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • Contact

© 2014 - 2024 CaspianBarrel - Xəzərin neft və qaz xəbələri.