Monday, July 20, 2026
Caspian Barrel
Advertisement
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • About Us
  • Azərbaycan
  • English
  • Русский
No Result
View All Result
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • About Us
  • Azərbaycan
  • English
  • Русский
No Result
View All Result
Caspian Barrel
No Result
View All Result

Lukoil completes installation of wellhead platform topside at Korchagin field

30/04/2018
Lukoil completes installation of wellhead platform topside at Korchagin field
16
VIEWS
Share on FacebookShare on Twitter

LUKOIL has completed the installation of the wellhead platform’s topside as part of Yury Korchagin field Phase 2 development in the Russian sector of the Caspian Sea.

The wellhead platform is a satellite platform designed to drill wells in the eastern part of the field. Drilling at Phase 2 is expected to start in May, 2018.

Apart from the process equipment, the platform is equipped with the safety systems, living quarters for the personnel’s temporary stay and a helideck. As most of the operations are automated, only eight workspaces are designed for the temporary stay of the personnel.

Produced oil and gas will be transported to the host platform through the subsea pipelines and treated for the delivery onshore.

Lukoil.com

 

Tags: LUKoilYury Korchagin field

Related Posts

Russia’s Lukoil lends Socar $1.5 billion in deal to supply its Turkish STAR refinery
Azerbaijan

Russia’s Lukoil lends Socar $1.5 billion in deal to supply its Turkish STAR refinery

06/10/2023
Reserves of the Caspian field LUKoil may amount to 140-150 mln tons
Russia

Reserves of the Caspian field LUKoil may amount to 140-150 mln tons

25/04/2022
“Lukoil”un ticarət operatoru Rusiyadakı fəaliyyətini məhdudlaşdırır
Russia

Lukoil’s global trading arm scales back operations following sanctions

25/03/2022
LUKOIL will put into operation a new field in the Caspian Sea in 2022
Russia

LUKOIL will put into operation a new field in the Caspian Sea in 2022

06/02/2022
LUKoil to pay $ 1.45 billion for the acquisition of a share in Shah Deniz
Russia

LUKoil to pay $ 1.45 billion for the acquisition of a share in Shah Deniz

13/12/2021
LUKoil decided to build offshore wind turbines around the Absheron peninsula
Azerbaijan

LUKoil decided to build offshore wind turbines around the Absheron peninsula

11/12/2021
Please login to join discussion
WTI Crude Price
Brent Crude Price

Vacancy

PD&MS Group is looking for a Senior Project Engineer

14/07/2026
Vacancy

International Company is looking for a Service and maintenance engineer on Subsea Equipment 

03/07/2026
Vacancy

PD&MS Group is looking for a Lead Designer

08/07/2026
Vacancy

International Company is looking for a Commissioning Engineer

29/06/2026
Vacancy

International Company is looking for a Commissioning Engineer

29/06/2026
Vacancy

International company is looking for a Proposal Manager

01/07/2026
Vacancy

International company is looking for a Project Manager

24/06/2026
Vacancy

Siemens Energy Global GMBH & CO KG is looking for a Sales Director for Turkey & Central Asia

17/06/2026
Azerbaijan

Azerbaijan’s oil and gas sector decreased by 1%

10/06/2026
Azerbaijan

Average monthly wages in Azerbaijan increase by 6.5%

10/06/2026

No Result
View All Result
  • Azərbaycan
  • English
  • Русский
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • Contact

© 2014 - 2024 CaspianBarrel - Xəzərin neft və qaz xəbələri.