Monday, March 9, 2026
Caspian Barrel
Advertisement
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • About Us
  • Azərbaycan
  • English
  • Русский
No Result
View All Result
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • About Us
  • Azərbaycan
  • English
  • Русский
No Result
View All Result
Caspian Barrel
No Result
View All Result

TAP pipe deliveries complete to Albania, Greece, Italy

16/10/2017
Завершена поставка труб для строительства TAP
6
VIEWS
Share on FacebookShare on Twitter
The last shipment of steel line-pipes for the construction of the Trans Adriatic Pipeline (TAP) arrived in Thessaloniki, Greece on October 10, marking the completion and final delivery of all line-pipes to TAP’s host countries, said the message from TAP AG consortium.

 

 

The transport of 55,000 TAP pipes and bends was completed in approximately one year and a half. The first pipes arrived in Durrës, Albania in April 2016 and deliveries to Greece started one month later, in May 2016.

Approximately 55,000 pipes are used to build TAP (32,000 in Greece; 13,000 in Albania; 9,150 offshore and 670 in Italy)

The weight of all pipes amounts to 520,000 tonnes: or approximately 71 Eiffel towers. The weight of a single 18-metre pipe ranges from 9.3 tonnes to 16.3 tonnes, depending on the wall thickness.

The pipes were manufactured by Corinth Pipeworks (Greece) and Salzgitter Mannesmann International (Germany).

Commenting on the issue, John Haynes, TAP project director noted that this is yet another key milestone towards successful realization of the project.

“The entire logistics delivery process was carried out in line with the project schedule and to the highest safety standards,” he added.

TAP is a part of the Southern Gas Corridor which is one of the priority energy projects for the EU.

TAP project envisages transportation of gas from the Stage 2 of development of Azerbaijan’s Shah Deniz gas and condensate field to the EU countries.

The pipeline will be connected to the Trans-Anatolian Pipeline (TANAP) on the Turkish-Greek border, run through Greece, Albania and the Adriatic Sea, before coming ashore in Italy’s south.

TAP’s shareholders are: BP (20 percent), State Oil Company of Azerbaijan (20 percent), Snam (20 percent), Fluxys (19 percent), Enagas (16 percent) and Axpo (5 percent).

TAP will be 878 kilometers in length (Greece 550 km, Albania 215 km, Adriatic Sea 105 km, and Italy 8 km). Its highest point will be 1,800 meters in Albania’s mountains, while its lowest point will be 820 meters beneath the sea.

Tags: gas pipelineSGCTAP

Related Posts

Azərbaycan qazının Avropa bazarlarına çıxarılmasının beş ili
Azerbaijan

The first five years of Azerbaijani gas in European markets

19/12/2025
Volume of gas supply via IGB since the start of commercial operations revealed
Azerbaijan

Volume of gas supply via IGB since the start of commercial operations revealed

28/11/2025
TAP pipeline hits 50 Bcm milestone in gas exports to Europe
Azerbaijan

TAP pipeline hits 50 Bcm milestone in gas exports to Europe

09/09/2025
SOCAR приступил к прямым поставкам газа потребителям в Болгарии
Azerbaijan

Moody’s: Azerbaijan benefits from higher EU gas demand

08/07/2024
MVM Group acquires a stake in one of the world’s largest offshore natural gas fields
Azerbaijan

MVM Group acquires a stake in one of the world’s largest offshore natural gas fields

05/06/2024
Швейцарская AXPO выходит из проекта TAP
İnteresting News

TAP working on concepts for future expansion cases

04/06/2024
Please login to join discussion
WTI Crude Price
Brent Crude Price

Vacancy

International Company is looking for a Service and maintenance engineer on Subsea Equipment 

06/03/2026
Vacancy

International company is looking for a Senior Vessel Operations Engineer

04/03/2026
Vacancy

International Company ia looking for a Project Engineer

06/03/2026
Vacancy

International Company is looking for a Technical Supervisor on  Workover and completion System

03/03/2026
Vacancy

International company is looking for a Supervisor, Technical Support on FMC Workover and Completion System

03/03/2026
Vacancy

International Company is looking for a Well Site Geologist

27/02/2026
Vacancy

International Company is looking for a General Field Supervisor

27/02/2026
Vacancy

International Company is looking for a Job Delivery Lead

27/02/2026
Vacancy

International Company is looking for a Subsea Field Service Specialist

27/02/2026
Vacancy

International Company is looking for a Subsea Field Service Lead Technician

27/02/2026

No Result
View All Result
  • Azərbaycan
  • English
  • Русский
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • Contact

© 2014 - 2024 CaspianBarrel - Xəzərin neft və qaz xəbələri.