Friday, August 7, 2026
Caspian Barrel
Advertisement
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • About Us
  • Azərbaycan
  • English
  • Русский
No Result
View All Result
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • About Us
  • Azərbaycan
  • English
  • Русский
No Result
View All Result
Caspian Barrel
No Result
View All Result

PEDEC inks deal with domestic firm to build oil storage tanks

01/10/2018
PEDEC inks deal with domestic firm to build oil storage tanks
9
VIEWS
Share on FacebookShare on Twitter

Iran’s Petroleum Engineering and Development Company (PEDEC) struck a BOT contract with a domestic firm for construction of 10-million-barrel crude oil storage tanks.

The Build–operate–transfer (BOT) contract was signed on Sunday by PEDEC CEO Touraj Dehghani and Asghar Gorzin, CEO of Petro-Omid Asia, and Ahmad Ebrahimi, the managing director of Omid Investment Management Group, as part of the Iranian Petroleum Ministry’s strategic plant to develop Jask Port and deliver crude oil from Goreh, Bushehr, to Jask, southern Iran.

The project will be implemented with 200 million euros in initial investment over a period of three years. The tanks will be operated for a period of 15 years.

The National Iranian Oil Company (NIOC) has possessed about 5000 acres of coastal land located 65 kilometers west of Jask city, near Mubarak Mount, for construction of special oil, gas, refining and petrochemical projects. Thanks to a permit for construction of the 42-inch Gorejh-Jask crude oil pipeline, part of the land in western Jask has been allocated for the construction of an oil terminal for export of crude oil and construction of crude oil storage tanks at Jask port, and construction of these tanks are now on the agenda of NIOC.

The crude oil storage tanks are being built with 10 million barrels of light and heavy crude oil storage capacity, and include 20 floating roof metal tanks, each with a capacity of 500 thousand barrels. These tanks will store the crude oil pumped from the 42-inch Goreh-Jask oil pipeline, and pumps it to seabed pipelines and SBMs.

The project can be expanded to a storage capacity of over 30 million barrels of crude oil.

In accordance with the terms of the contract, the investor undertakes to, within three years, provide capital, designing, procurement of the required goods and equipment, construction and commissioning of the facility, and repair, maintain and operate it within 15 years. The ownership of the complex after the 18-year period will be transferred to the National Iranian Oil Company.

Shana.ir

 

Tags: Iran's Petroleum Engineering and Development Company (PEDEC)National Iranian Oil Company (NIOCPEDEC CEO Touraj Dehghani and Asghar Gorzin

Related Posts

NIOC to offer oil on domestic stock market by October
Iran

NIOC to offer oil on domestic stock market by October

11/10/2018
Iran plans expanding oil export spots by developing Makran
Iran

Iran plans expanding oil export spots by developing Makran

02/10/2018
Please login to join discussion
WTI Crude Price
Brent Crude Price

Vacancy

International Company is looking for a Project Manager

29/07/2026
Vacancy

International Company is looking for a Team lead

29/07/2026
Kateqoriyasız

EnerMech OGP is looking for a Crane Operator 

27/07/2026
Vacancy

PD&MS Group is looking for a Construction Delivery Lead (Baku)

27/07/2026
Azerbaijan

GL Group Appoints Farid Baghirov as Group Vice-President of Commercial and Business Development

23/07/2026
Azerbaijan

GL Group Announces Establishment of U.S. Presence and Appointment of Executive Vice President, North America

23/07/2026
Azerbaijan

GL Group Signs Strategic Cooperation Services Agreement with Baker Hughes

23/07/2026
Azerbaijan

Historic Milestone: GL Group Becomes the First Azerbaijani Company to Acquire Four Oil and Gas Assets in the United States

23/07/2026
Vacancy

Wood Nobel Energy is looking for an Engineering Manager

27/07/2026
Vacancy

PD&MS Group is looking for a Senior Project Engineer

14/07/2026

No Result
View All Result
  • Azərbaycan
  • English
  • Русский
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • Contact

© 2014 - 2024 CaspianBarrel - Xəzərin neft və qaz xəbələri.