Saturday, May 17, 2025
Caspian Barrel
Advertisement
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • About Us
  • Azərbaycan
  • English
  • Русский
No Result
View All Result
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • About Us
  • Azərbaycan
  • English
  • Русский
No Result
View All Result
Caspian Barrel
No Result
View All Result

TAP installs three turbo compressors in Albania – VIDEO

11/06/2018
90% of TAP route cleared in Greece, Albania
0
VIEWS
Share on FacebookShare on Twitter
On 8 June 2018, the Trans Adriatic Pipeline (TAP) AG marked the successful installation of all three turbo compressors at its compressor station in Fier, Albania.

The turbo compressors are effectively the “beating heart” of the compressor station and will play a key role in ensuring gas transportation through the pipeline system. The construction progress of the Fier compressor station is over 30% complete and more than 210 people work there, 70% of whom are locally employed.

The installation of the turbo compressors was marked by a ceremony attended by H.E. Edi Rama, the Prime Minister of Albania, Mr. Damian Gjiknuri, the Minister of Infrastructure and Energy, Mr. Arben Ahmetaj, the Minister of Finance and Economy, Mr. Luca Schieppati, TAP Managing Director, Mr. Walter Peeraer, TAP President, Mr. John Haynes, TAP Project Director, and Mr. Michele Elia, TAP’s Country Manager Albania Ad-interim. Participants also included numerous mayors, representatives of local authorities, diplomatic corps and other key stakeholders.

Prime Minister Rama underlined the strong collaboration between TAP and Albania. “The Albanian authorities’ speedy delivery of permits will encourage additional foreign direct investment,” Mr. Rama noted. According to the Head of Albanian Government, “TAP is a success story and, as such, its example leads to other investments in energy projects, including IAP. In fact, TAP’s example has already encouraged several other international companies to show interest and invest in the oil & gas sector in Albania.” Branding TAP as a “reference project for other investors,” Mr. Rama concluded that despite the complexity of procedures at times “TAP was fully compliant with Albanian legal requirements.”

The Infrastructure and Energy Minister Gjiknuri emphasised the importance of TAP for the economy and its strategic significance for the future of the country. According to the Minister, “TAP will have a positive impact on the country’s gasification and its energy sector in general.” The Minister stated that “TAP was the first energy project of this scale to be implemented in Albania and its progress was impressive.” Speaking about TAP’s positive impact on the country, Minister Gjiknuri highly appreciated “the tangible know-how transfer” that both the Albanian workforce and local companies have gained through their engagement with the Project.

TAP Managing Director Luca Schieppati said that today’s event marked another milestone for Albania’s energy journey. “We believe that TAP will become a key element for this future journey, contributing to energy security, diversification and decarbonisation. Benefiting from the continued support of the Albanian Government, local authorities and local communities, TAP will continue to progress, delivering a modern, safe and robust pipeline, supporting the delivery of new gas in the country and beyond.”

TAP Project Director John Haynes added: “We’re one step closer to completing the project and bringing gas to Europe. TAP’s compressor station in Fier is the most important above ground installation in Albania and Fier will be one of TAP’s exit points planned in Albania. This will also be the starting point of the Ionian Adriatic Pipeline (IAP), which further elevates the strategic importance of Fier and Albania in the wider region.”

TAP’s Country Manager Albania Ad-interim Michele Elia stated that he “wanted to thank the Albanian central and local governments for being very supportive to TAP and all TAP and contractors’ employees for their challenging work towards delivering the pipeline in line with schedule and applying the highest safety standards.”

Tap-ag.com

 

Tags: Trans Adriatic Pipeline

Related Posts

İlham Əliyev: “İndi biz gələcəyə baxmalıyıq, çünki biz yeni qaz yataqları kəşf etmişik”
Azerbaijan

Ilham Aliyev: “Now we must focus on the future because we have discovered new gas fields”

13/10/2021
TAP-ın Albaniyadakı kompressor stansiyasının inşası yekunlaşıb

TAP project is highly significant for Italy, for whole of EU

25/02/2020
SOCAR Bolqarıstanın qazpaylayıcı şəbəkəsinə sərmayə qoymağa maraq göstərir
Azerbaijan

TAP to meet 40% of Bulgaria’s gas demand

03/02/2018
TANAP-la Türkiyəyə ilk təbii qaz gələn il iyulun 1-də veriləcək
Azerbaijan

Pipes laid on 620 Km of Greek-Albanian section of TAP

23/12/2017
Work on Building TAP in Sea to Start in 2018
İnteresting News

Work on Building TAP in Sea to Start in 2018

09/08/2017
Please login to join discussion
WTI Crude Price
Brent Crude Price

Vacancy

International Company is looking for a K951-ESG-Tech Prof-Completions, Assoc

16/05/2025
Vacancy

International Company is looking for a FRS09-ESG-Geoscientist II

16/05/2025
Vacancy

International Company is looking for an Assoc Tech Prof.-Cementing

16/05/2025
MOSCOW, RUSSIA - JULY 7, 2020: A fuel attendant works at a Rosneft petrol station. Sergei Fadeichev/TASS

Россия. Москва. Сотрудник автозаправочной станции компании "Роснефть". Сергей Фадеичев/ТАСС
Azerbaijan

Fuel expenses of Azerbaijan’s population rose by 7% in Jan.-Apr. 2025

14/05/2025
Vacancy

SOCAR Polymer LLC is looking for a Process Safety Team Leader

12/05/2025
Vacancy

PD&MS Group is looking for a Project Manager

11/05/2025
Vacancy

PD&MS Group is looking for a Contract Manager / SPA

11/05/2025
Vacancy

PD&MS Group is looking for a Lead Designer (Baku)

11/05/2025
Vacancy

International Company is looking for a Technical Advisor, PSL- Sales, Prin

06/05/2025
Vacancy

International Company is looking for an INSITE Spec-SDL, Jr (SV06-ESG)

06/05/2025

No Result
View All Result
  • Azərbaycan
  • English
  • Русский
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • Contact

© 2014 - 2024 CaspianBarrel - Xəzərin neft və qaz xəbələri.