Tuesday, January 13, 2026
Caspian Barrel
Advertisement
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • About Us
  • Azərbaycan
  • English
  • Русский
No Result
View All Result
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • About Us
  • Azərbaycan
  • English
  • Русский
No Result
View All Result
Caspian Barrel
No Result
View All Result

Eurasian Development Bank to fund coal production in Kazakhstan

22/02/2018
Eurasian Development Bank to fund coal production in Kazakhstan
1
VIEWS
Share on FacebookShare on Twitter
The Eurasian Development Bank (EDB) and Bogatyr Komir company signed a loan agreement to finance Bogatyr Komir’s investment program aimed at modernizing coal production processes at the Bogatyr mine, the press service of EDB said in a message.
The document was signed by Andrey Beliyaninov, Chairman of the Management Board, from the EDB, and Murat Abdygulov, General Director, and Nikolay Korsakov, First Deputy General Director and CFO, from Bogatyr Komir.

The EDB will extend a loan facility of 196.6 million euro for eleven years. The loan will be used to finance an investment project to modernize production at the Bogatyr mine by introducing continuous mining technology.

This is expected to raise the output to 50 million tons, improve the quality of end products, cut mining costs, and reduce adverse environmental impacts. A part of end products will be exported to Russia.

“The project supports the development of the country’s power sector,” said Andrey Beliyaninov, Chairman of the Management Board at the EDB.

“It is also important to the EDB that it has a significant integration effect. In particular, it will help to enhance the efficiency of coal mining, maintain output for a longer period of time, and promote trade between Russia and Kazakhstan,” he said.

The EDB’s new loan agreement with Bogatyr Komir, one of Kazakhstan’s largest coal miners and the main employer in Pavlodar Region for over 6,000 people, is the third one, in addition to the loan facilities opened in December 2011 and November 2013. Back then, the Bank extended some $50 million and $25 million for seven years, respectively.

Over the first ten years from its start, the project is expected to raise coal output by an average of $75 million a year and increase mutual trade between the EDB countries as a result of coal exports by $27 million a year on average. It will also help to minimize adverse environmental impact, as extracted coal will be stored within the mines.

Trend.az

 

Tags: Coal productionThe Eurasian Development Bank

Related Posts

No Content Available
Please login to join discussion
WTI Crude Price
Brent Crude Price

Vacancy

International Company is looking for a PCS Engineer

08/01/2026
Azerbaijan

The first five years of Azerbaijani gas in European markets

19/12/2025
Vacancy

MHWirth AS is looking for an Overhaul & Modification Manager

22/12/2025
Vacancy

MHWirth AS is looking for a Training, Optimization & Upgrades Manager

22/12/2025
Vacancy

International Company is looking for a Sure Service Engineer

15/12/2025
Vacancy

International Company is looking for a  Crane Focal Point

09/12/2025
Vacancy

International Company is looking for a Crane Operator 

09/12/2025
Vacancy

International Company is looking for a Crane Focal Point

09/12/2025
Vacancy

International Company is looking for a  Crane Reliability Manager

09/12/2025
Vacancy

International Company is looking for a Diesel  Engineer

09/12/2025

No Result
View All Result
  • Azərbaycan
  • English
  • Русский
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • Contact

© 2014 - 2024 CaspianBarrel - Xəzərin neft və qaz xəbələri.