Monday, June 16, 2025
Caspian Barrel
Advertisement
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • About Us
  • Azərbaycan
  • English
  • Русский
No Result
View All Result
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • About Us
  • Azərbaycan
  • English
  • Русский
No Result
View All Result
Caspian Barrel
No Result
View All Result

Iran to soon surpass Qatar in South Pars

05/01/2018
Iran to soon surpass Qatar in South Pars
0
VIEWS
Share on FacebookShare on Twitter

With phase 14 going fully operational, Iran’s gas production from South Pars giant gas field (which Iran shares with Qatar in Persian Gulf) will surpass the Arab country, operator of the South Pars Phase 14 of development, Hamid-Reza Masoudi, said.

“The production from the field is around 500-570 million cubic meters per day (mcm/d) on average and with the phase 14 going operational, Iran’s output from the joint field will exceed that of Qatar, the official said in a press conference in the southern port city of Bandar Abbas on Tuesday after loading the platform 14A of phase 14.

“The two countries are recovering almost equal amounts of gas from the field,” he added.

Phase 14 is expected to produce 56.6 million cubic meters of sour gas and 75,000 billion barrels of gas condensate per day, one million tons of liquefied gas and one million tons of ethane per year, and 400 tons a day of sulfur.

The 2,530-ton platform 14A is projected to be installed on its designated offshore spot on January 20-22, starting production in phase 14.

According to the official, Phase 14 is progressing very smoothly and the project has currently witnessed near 77 percent of physical progress.

“Of the phase’s total 44 wells, 22 have been completed and drilling operations of another 11 wells will be done within two months,” Masoudi said.

‘The “most Iranian” Platform of South Pars field’

Masoudi called platform 14A, “the most Iranian platform” among the South Pars platforms constructed so far, saying, over 70 percent of the equipment applied for constructing platform 14A have been domestically manufactured and just those equipment that manufacturing them required some high technology have been imported.

He also put the average application of domestically manufactured equipment in development of South Pars at 60 percent. According to the operator, the cost of constructing this platform considering additional equipment needed for operation is estimated around $160 million.

The 35-by-35-meters platform has a height of 18 meters and 680 tons of equipment, including 71 kilometers of electric cables, 15,000 pieces of instrumentation equipment as well as 34,000 pieces of welding poles are mounted on it.

A consortium of Iranian companies including, Industrial Development and Renovation Organization of Iran (IDRO), Iranian Offshore Engineering and Construction Company, Iran National Drilling Company, Iran Offshore Shipbuilding and Offshore Industries Complex (ISOICO) and Mapna Group Company is in charge of implementing South Pars’ phase 14 development project.

The huge South Pars gas field, that Iran shares with Qatar in the Persian Gulf, covers an area of 9,700 square kilometers, 3,700 square kilometers of which, called South Pars, are in Iran’s territorial waters. The remaining 6,000 square kilometers, called North Dome, are situated in Qatar’s territorial waters.

The field is estimated to contain a significant amount of natural gas, accounting for about eight percent of the world’s reserves, and approximately 18 billion barrels of condensate.

Shana.ir

 

Tags: Hamid-Reza MasoudiIDROISOICOQatarSouth Pars Gas FieldSouth Pars’ phase 14

Related Posts

Murder on rig: Criminal inquiry into death of British worker off Qatar ongoing
İnteresting News

Murder on rig: Criminal inquiry into death of British worker off Qatar ongoing

16/12/2022
Qatar plans to increase LNG production by 43% in the next five years
İnteresting News

Qatar plans to increase LNG production by 43% in the next five years

22/06/2022
Qatar signs gas contract with South Korea
İnteresting News

Qatar signs gas contract with South Korea

13/07/2021
Qətər şirkətləri Azərbaycanda bərpa olunan enerji hərraclarına qatıla bilər
Azerbaijan

Qatari companies may participate in renewable energy auctions in Azerbaijan

21/06/2021
Qatar to annually supply 3M tons of LNG to Pakistan
İnteresting News

Qatar to annually supply 3M tons of LNG to Pakistan

02/03/2021
Qatar Bases Budget On $40 Oil To Withstand Volatility
İnteresting News

Qatar Bases Budget On $40 Oil To Withstand Volatility

04/11/2020
Please login to join discussion
WTI Crude Price
Brent Crude Price

Vacancy

“CYBERİA İNTERNATİONAL LLC-FZ” branch in Azerbaijan Republic is looking for Onshore Geotechnical Supervisor

11/06/2025
Vacancy

Siemens Energy Global GMBH & CO KG is looking for a Sales Director for Turkey & Central Asia

11/06/2025
Vacancy

International company is looking for a Project Director

11/06/2025
Azerbaijan

SOCAR signs natural gas sale agreement with Germany’s SEFE

10/06/2025
Vacancy

International Company is looking for a Senior Fishing Tools Supervisor

10/06/2025
Vacancy

International Company is looking for an Operations Manager

10/06/2025
Vacancy

SOCAR Downstream Management is looking for a Production Specialist

05/06/2025
Vacancy

BOS Shelf International FZCO is looking for a Structural Engineer

05/06/2025
Vacancy

BOS Shelf International FZCO is looking for a Lead Methods Engineer

05/06/2025
Vacancy

BOS Shelf International FZCO is looking for a Rigging Superintendent

05/06/2025

No Result
View All Result
  • Azərbaycan
  • English
  • Русский
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • Contact

© 2014 - 2024 CaspianBarrel - Xəzərin neft və qaz xəbələri.