Tuesday, March 17, 2026
Caspian Barrel
Advertisement
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • About Us
  • Azərbaycan
  • English
  • Русский
No Result
View All Result
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • About Us
  • Azərbaycan
  • English
  • Русский
No Result
View All Result
Caspian Barrel
No Result
View All Result

The French Almost Found Lender for Gas Project Absheron

13/04/2017
1
VIEWS
Share on FacebookShare on Twitter

The European Investment Bank (EIB) is interested in the project to develop a large gas condensate field Absheron in the Caspian Sea, said General Vice President of Total for Europe and Central Asia Michael Borrell yesterday in Baku at the meeting with the Minister of Energy Azerbaijan Natig Aliyev.

According to the report released by the ministry, Borrell told about the work done and planned as part of the sea project Absheron.

According to him, Total and its partners have increased efforts to start production from the field Absheron, but the timely receipt of the first gas from the field needs support from the state.

In turn, the Minister noted the desirability of Total’s participation in the development of other oil and gas fields in Azerbaijan, including the Babek prospective area.

During the meeting, the Minister was also presented the new Vice President of Total for Europe and the Caspian region Bernard Clementi.

The exploration PSA for the structure Absheron was signed in 2009. In September 2011, the project operator, Total, announced the opening of a new large gas condensate field in the Caspian Sea. After processing the obtained data Total confirmed the reserves of Absheron: 350 bcm of gas and 45 million tons of condensate.

In November 2016 SOCAR and Total agreed to develop an initial deposit stage. According to this, the whole volume of extracted hydrocarbons in the amount of 2 million tons of oil equivalent will be sold to SOCAR and in the future used in the domestic market.

Total expects the first gas from the field will be produced in early 2020. However, Turan’s interlocutors in SOCAR believe that with the implementation of a clear timetable the first gas can be received in the IV quarter of 2019. Until the middle of 2017 SOCAR will approve a commercial agreement on the first phase of the project Absheron. After that the project operator will start the project. That is, the first production of gas under the work program is to take 30 months.

* Participants in the project Absheron are the state company SOCAR – 40 percent, and the French companies Total (40 percent) and Engie (20 percent).

Related Posts

Abşeron Yatağının Tammiqyaslı İşlənməsi Layihəsi üçün ƏMSSTQ-nin açıqlanması
Azerbaijan

ESIA Disclosure for Absheron Full Field Development

16/03/2026
SOCAR President: Azerbaijan reinforces its position as regional energy hub
Azerbaijan

SOCAR President: Azerbaijan reinforces its position as regional energy hub

14/03/2026
Aliyev: Azerbaijan will continue to expand the geography of gas exports
Azerbaijan

Ilham Aliyev: Azerbaijan plans to increase gas production

14/03/2026
Rising U.S. Oil Production Reshapes Global Market Dynamics
İnteresting News

Rising U.S. Oil Production Reshapes Global Market Dynamics

14/03/2026
Vacancy

International Company is looking for a Service and maintenance engineer on Subsea Equipment 

06/03/2026
Vacancy

International company is looking for a Senior Vessel Operations Engineer

04/03/2026
Please login to join discussion
WTI Crude Price
Brent Crude Price

Azerbaijan

ESIA Disclosure for Absheron Full Field Development

16/03/2026
Azerbaijan

SOCAR President: Azerbaijan reinforces its position as regional energy hub

14/03/2026
Azerbaijan

Ilham Aliyev: Azerbaijan plans to increase gas production

14/03/2026
İnteresting News

Rising U.S. Oil Production Reshapes Global Market Dynamics

14/03/2026
Vacancy

International Company is looking for a Service and maintenance engineer on Subsea Equipment 

06/03/2026
Vacancy

International company is looking for a Senior Vessel Operations Engineer

04/03/2026
Vacancy

International Company ia looking for a Project Engineer

06/03/2026
Vacancy

International Company is looking for a Technical Supervisor on  Workover and completion System

03/03/2026
Vacancy

International company is looking for a Supervisor, Technical Support on FMC Workover and Completion System

03/03/2026
Vacancy

International Company is looking for a Well Site Geologist

27/02/2026

No Result
View All Result
  • Azərbaycan
  • English
  • Русский
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • Contact

© 2014 - 2024 CaspianBarrel - Xəzərin neft və qaz xəbələri.