Friday, November 6, 2026
Caspian Barrel
Advertisement
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • About Us
  • Azərbaycan
  • English
  • Русский
No Result
View All Result
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • About Us
  • Azərbaycan
  • English
  • Русский
No Result
View All Result
Caspian Barrel
No Result
View All Result

SOCAR talks implementation of AGRI project

13/04/2017
26
VIEWS
Share on FacebookShare on Twitter

agriThe Azerbaijan-Georgia-Romania Interconnector (AGRI) project is not dead, but its implementation needs time, Suleyman Gasimov, vice-president for economic issues at Azerbaijan’s state oil company SOCAR, said, Romanian media reported.

Gasimov said that the project requires big investments.

“It is necessary to build a terminal in Georgia, and then another one in Romania,” he noted.

Currently, SOCAR participates in other projects – the Trans Adriatic Pipeline (TAP) and Trans Anatolian Natural Gas Pipeline (TANAP), which envisage the supplies of Azerbaijani gas to Europe.

However, SOCAR vice-president said that the AGRI project may be implemented if all its parties support the project’s implementation.

AGRI project envisages transportation of Azerbaijani gas to the Black Sea coast of Georgia via gas pipelines. Azerbaijani gas delivered to Georgia’s Black Sea coast will be liquefied at a special terminal and following this, it will be delivered in tankers to a terminal at the Romanian port of Constanta.

Further, it will be brought to the gaseous state and sent via Romanian gas infrastructure for meeting the demands of Romania and other European countries.

The cost of the project will vary from 1.2 billion euros to 4.5 billion euros, according to the preliminary estimations.

The participants of the AGRI project are the State Oil Company of Azerbaijan (SOCAR), Georgia’s Oil and Gas Corporation, as well as MVM (Hungary) and Romgaz (Romania).

The parties established the SC AGRI LNG Project Company SRL in February 2011 for the implementation of the project.

Trend

Related Posts

Vacancy

International company is looking for a Vessel Assets Manager

22/10/2026
Vacancy

International company is looking for a Supply Chain Manager

22/10/2026
Vacancy

International company is looking for a Project HSE Manager

22/10/2026
Vacancy

International Company is looking for an Onshore Package Control Lead

19/10/2026
Vacancy

International company is looking for an Offshore Project Control Lead

19/10/2026
Kateqoriyasız

International company is looking for a Drilling and Completion Night Supervisor (DCSV)

20/10/2026
Please login to join discussion
WTI Crude Price
Brent Crude Price

Vacancy

International company is looking for a Vessel Assets Manager

22/10/2026
Vacancy

International company is looking for a Supply Chain Manager

22/10/2026
Vacancy

International company is looking for a Project HSE Manager

22/10/2026
Vacancy

International Company is looking for an Onshore Package Control Lead

19/10/2026
Vacancy

International company is looking for an Offshore Project Control Lead

19/10/2026
Kateqoriyasız

International company is looking for a Drilling and Completion Night Supervisor (DCSV)

20/10/2026
Vacancy

International company is looking for a Senior Subsea Engineer

20/10/2026
Vacancy

SOCAR Downstream Management is looking for an Operation Technologies Manager

27/10/2026
Vacancy

SOCAR Downstream Management is looking for a HSE and Process Safety Director  

27/10/2026
Vacancy

SOCAR Downstream Management is looking for a Laboratory Manager

27/10/2026

No Result
View All Result
  • Azərbaycan
  • English
  • Русский
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • Contact

© 2014 - 2024 CaspianBarrel - Xəzərin neft və qaz xəbələri.