Thursday, April 16, 2026
Caspian Barrel
Advertisement
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • About Us
  • Azərbaycan
  • English
  • Русский
No Result
View All Result
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • About Us
  • Azərbaycan
  • English
  • Русский
No Result
View All Result
Caspian Barrel
No Result
View All Result

ESIA Disclosure for Absheron Full Field Development

16/03/2026
Abşeron Yatağının Tammiqyaslı İşlənməsi Layihəsi üçün ƏMSSTQ-nin açıqlanması
48
VIEWS
Share on FacebookShare on Twitter

The Joint Venture of Absheron project – TotalEnergies, SOCAR, and XRG – is pleased to announce the public disclosure of the Environmental and Social Impact Assessment (ESIA) for the Absheron Full Field Development Project. This disclosure is carried out in accordance with the requirements of Law No. 1175 of the Republic of Azerbaijan on Environmental Impact Assessment dated June 12, 2018, as well as the international environmental and social performance standards, and the JV’s commitment to transparent, responsible project development.

Two public consultation meetings will be organised to disclose the Draft ESIA Report and will take place on:

  • April 02, 2026, from 10:00 – 13:00 to the Landmark III Business Center (Conference room), Baku,

  • April 03, 2026, from 10:00 – 13:00 to the Sangachal Cultural House.

The Draft ESIA paper version is available at:

  • Landmark III Business Center – Lobby – 90 A Nizami Street – Baku,
  • Sangachal Cultural House – Garadagh District, Sangachal Settlement, Suvorov Street.
  • French-Azerbaijani University – Lobby – 183 Nizami Street – Baku

The Draft ESIA is available online at:

https://totalenergies.com/fr/azerbaidjan/absheron-ffd-esia

We are looking forward to meeting you in person at one of the meeting venues.

The purpose of the ESIA disclosure is to:

  • Present the scope, activities, and anticipated impacts of the Absheron Project.
  • Inform stakeholders – including government bodies, local communities, NGOs, and the public – about the project’s environmental and social impacts.
  • Provide an opportunity for public to review the ESIA and share feedback, concerns, or recommendations.

Project Overview:

Absheron gas and condensate field is located in the Caspian Sea 100 km south-east of the coast. Joint venture comprises of TotalEnergies EP Absheron B.V (TEPAB) 35%, SOCAR Absheron 35% and ADNOC XRG 30%. First development phase production started up early July 2023. This first phase connects a subsea production well to a new gas processing platform, linked to SOCAR’s existing facilities in Oil Rocks. It has a production capacity of 4 million cubic meters of gas per day and 13,000 barrels a day of condensate. The gas is sold on the domestic market in Azerbaijan.

Following Phase 1, partners took on to progress Full Field Development of Absheron with Front End Engineering Design (FEED) started in early 2025. The objective is to reach the Final Investment Decision (FID) in the course of 2026. The Full Field Development phase is expected to bring 110 kboe/d of additional production at plateau. The development concept encompasses a significant subsea development of three deepwater wells tied back through a 140km subsea multiphasic pipe to new-built onshore facilities in Sangachal for the processing and export of gas and liquids. At plateau, the Phase 2 will produce 12.7 million cubic meters per day (4.5 billion cubic meter per year) and an initial 35,000 barrels per day of condensate in addition to Phase 1 production.

Tags: Absheron gas fieldSOCARTotalEnergiesXRGАбшерон

Related Posts

SOCAR President: Azerbaijan reinforces its position as regional energy hub
Azerbaijan

SOCAR President: Azerbaijan reinforces its position as regional energy hub

14/03/2026
SOCAR ADNOC ilə “Abşeron” yatağının tammiqyaslı işlənmə layihəsini müzakirə edib
Azerbaijan

SOCAR, ADNOC discuss full-field development of Absheron gas-condensate field

21/01/2026
Azərbaycan qazının Avropa bazarlarına çıxarılmasının beş ili
Azerbaijan

The first five years of Azerbaijani gas in European markets

19/12/2025
Press Release – AICC Caspian
Azerbaijan

Press Release – AICC Caspian

08/12/2025
SOCAR: Gələn il “Abşeron” yatağı ilə bağlı investisiya qərarı veriləcək
Azerbaijan

SOCAR: Investment decision on Absheron field expected next year

28/11/2025
SOCAR, SLB to cooperate in redevelopment of Bahar and Gum Deniz fields
Azerbaijan

SOCAR, SLB to cooperate in redevelopment of Bahar and Gum Deniz fields

11/10/2025
WTI Crude Price
Brent Crude Price

Vacancy

International Company is looking for a Technical Support on FMC Workover and Completion System (IWOCS)/ WOCS Operator/

09/04/2026
Vacancy

International Company is looking for a Technical Support on FMC Subsea Workover and Completions System/ Completion Shift Leader

09/04/2026
Vacancy

International Company is looking for a Drilling Contracts & Procurement Engineer

09/04/2026
Vacancy

International Company is looking for a Project Contracts and Procurement Engineer

09/04/2026
Vacancy

Wood Nobel Energy is looking for a Principal Process Engineer

09/04/2026
Vacancy

PD&MS Group is looking for a Senior Project Engineer

15/04/2026
Azerbaijan

ESIA Disclosure for Absheron Full Field Development

16/03/2026
Azerbaijan

SOCAR President: Azerbaijan reinforces its position as regional energy hub

14/03/2026
Azerbaijan

Ilham Aliyev: Azerbaijan plans to increase gas production

14/03/2026
İnteresting News

Rising U.S. Oil Production Reshapes Global Market Dynamics

14/03/2026

No Result
View All Result
  • Azərbaycan
  • English
  • Русский
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • Contact

© 2014 - 2024 CaspianBarrel - Xəzərin neft və qaz xəbələri.