Saturday, April 18, 2026
Caspian Barrel
Advertisement
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • About Us
  • Azərbaycan
  • English
  • Русский
No Result
View All Result
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • About Us
  • Azərbaycan
  • English
  • Русский
No Result
View All Result
Caspian Barrel
No Result
View All Result

FEED for Absheron Development Phase 2 kicks off

24/02/2025
“Abşeron” yatağında  modulların dənizdə quraşdırılması başa çatıb
425
VIEWS
Share on FacebookShare on Twitter

Front End Engineering Design (FEED) for the Absheron Development Phase 2 has kicked off, Baku office of TotalEnergies told Trend.

“Absheron Development Phase 2 (Full Field Development – FFD) Front End Engineering Design (FEED) started in early 2025 with the objective of reaching readiness for the Final Investment Decision (FID) in one year,” said the company.

TotalEnergies said it is maintaining stable and safe production for the Absheron Development Phase 1 which is operational since July 2023 with production of 1.5 billion cubic meters per year and 12,000 barrels of condensate per day.

The Absheron field is located on the Caspian Sea shelf, 100 kilometers southeast of Baku and 25 kilometers northeast of Shah Deniz.

Gas and condensate production from Absheron has been carried out since July 2023 by the operating company JOCAP on the basis of an early production project from one deepwater well.

Under an agreement with the partners, SOCAR purchases this gas, and the condensate goes to the Baku-Tbilisi-Ceyhan pipeline.

Tags: Azerbaijani gasDevelopment Phase 2TotalEnergiesАбшерон

Related Posts

Abşeron Yatağının Tammiqyaslı İşlənməsi Layihəsi üçün ƏMSSTQ-nin açıqlanması
Azerbaijan

ESIA Disclosure for Absheron Full Field Development

16/03/2026
Azərbaycan qazının Avropa bazarlarına çıxarılmasının beş ili
Azerbaijan

The first five years of Azerbaijani gas in European markets

19/12/2025
SOCAR: Gələn il “Abşeron” yatağı ilə bağlı investisiya qərarı veriləcək
Azerbaijan

SOCAR: Investment decision on Absheron field expected next year

28/11/2025
Ukrainian energy minister: Kyiv in talks with Baku on new gas supplies
Azerbaijan

Ukrainian energy minister: Kyiv in talks with Baku on new gas supplies

20/08/2025
Azərbaycan qazının Suriyaya tədarükü avqustun 2-də başlayacaq
Azerbaijan

Azerbaijani gas to start flowing to Syria via Türkiye on August 2

30/07/2025
“Ümid” yatağında rekord göstəricilərlə 18 saylı quyu istismara verilib
Azerbaijan

Azerbaijan operator plans Caspian drilling campaign in bid to boost gas output

09/07/2025
WTI Crude Price
Brent Crude Price

Vacancy

International Company is looking for a Technical Support on FMC Workover and Completion System (IWOCS)/ WOCS Operator/

09/04/2026
Vacancy

International Company is looking for a Technical Support on FMC Subsea Workover and Completions System/ Completion Shift Leader

09/04/2026
Vacancy

International Company is looking for a Drilling Contracts & Procurement Engineer

09/04/2026
Vacancy

International Company is looking for a Project Contracts and Procurement Engineer

09/04/2026
Vacancy

Wood Nobel Energy is looking for a Principal Process Engineer

09/04/2026
Vacancy

PD&MS Group is looking for a Senior Project Engineer

15/04/2026
Azerbaijan

ESIA Disclosure for Absheron Full Field Development

16/03/2026
Azerbaijan

SOCAR President: Azerbaijan reinforces its position as regional energy hub

14/03/2026
Azerbaijan

Ilham Aliyev: Azerbaijan plans to increase gas production

14/03/2026
İnteresting News

Rising U.S. Oil Production Reshapes Global Market Dynamics

14/03/2026

No Result
View All Result
  • Azərbaycan
  • English
  • Русский
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • Contact

© 2014 - 2024 CaspianBarrel - Xəzərin neft və qaz xəbələri.