Wednesday, August 19, 2026
Caspian Barrel
Advertisement
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • About Us
  • Azərbaycan
  • English
  • Русский
No Result
View All Result
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • About Us
  • Azərbaycan
  • English
  • Русский
No Result
View All Result
Caspian Barrel
No Result
View All Result

Poland’s Gaz-System starts laying Baltic Pipe in Baltic Sea

28/06/2021
Poland’s Gaz-System starts laying Baltic Pipe in Baltic Sea
15
VIEWS
Share on FacebookShare on Twitter

On 27 June, Castorone, one of the marine vessels responsible for constructing the offshore gas pipeline between Poland and Denmark, started laying Baltic Pipe in the Baltic Sea, Report informs, citing the Polish Gas Transmission Operator Gaz-System S.A.

The pipelay started at a place near the halfway point of the entire offshore gas pipeline route, in Danish waters, close to the island of Bornholm. Castorone will be successively moving north-west along the pipeline route.

“Baltic Pipe is an investment implemented step by step and in line with the schedule. Weather and other circumstances we cannot influence may be changeable, but we do not slow down, and we do our job. Today, Gaz-System starts laying the offshore pipeline section so that the whole project can be completed and handed over for operation at its full capacity in 2022. Baltic Pipe will then be one of the main components to guarantee Poland’s energy security,” Polish Governmental Plenipotentiary for Strategic Energy Infrastructure Piotr Naimski said.

“Gaz-System has reached another important milestone in Baltic Pipe implementation. After five years of planning, designing, and selecting contractors, laying the first offshore gas pipeline in the history of the Polish gas industry has just started. By the end of this year, we are planning to weld and lay on the Baltic seabed 275 kilometers of pipeline, connecting the coasts of Poland and Denmark. Castorone, one of the largest special-purpose vessels of its kind, will perform the pipelay operations in the deepest waters”, President of Gaz-System Tomasz Stępień said.

Baltic Pipe offshore gas pipeline will be laid by three installation vessels: Castorone, Castoro Sei, and Castoro 10. Castorone is the largest ship engaged in offshore gas pipeline construction in the Baltic Sea. It uses the Dynamic Positioning System, thanks to which it can be maneuvered very precisely. It is over 300-meter long, nearly 40-meter wide, and can board as many as 700 people. It also has a helipad and several stations for welding individual pipe sections and joining them into the final pipeline. The welded pipeline will be lowered into the sea using a special ramp at the vessel’s stern. It consists of three parts which, by adjusting the slope, allow the pipeline to be installed at different depths.

Two more ships, Castoro Sei and Castoro 10, are currently stationed in Rotterdam, ready to join Baltic Pipe laying operations.

Apart from Castorone, other vessels engaged in subsea works under the Baltic Pipe project are working in the Baltic Sea now. Some of the operations they are involved in are pipe deliveries, surveys, dredging, rock placement, and preparation of crossings with the existing third-party infrastructure on the pipeline route.

Laying the almost 275-km long offshore pipeline will take a few months. If the weather allows, the entire process will still be completed this year.

Tags: gas pipelinePoland

Related Posts

Volume of gas supply via IGB since the start of commercial operations revealed
Azerbaijan

Volume of gas supply via IGB since the start of commercial operations revealed

28/11/2025
TAP pipeline hits 50 Bcm milestone in gas exports to Europe
Azerbaijan

TAP pipeline hits 50 Bcm milestone in gas exports to Europe

09/09/2025
IGB operator announces start of binding phase for capacity expansion
İnteresting News

IGB operator announces start of binding phase for capacity expansion

20/05/2024
Афганистан подпишет 7 соглашений с партнерами по проекту ТАПИ
Turkmenistan

The Afghan authorities announced the imminent resumption of construction of the TAPI

15/04/2024
Greek Ambassador to Azerbaijan on the role of the TAP gas pipeline
Azerbaijan

Greek Ambassador to Azerbaijan on the role of the TAP gas pipeline

03/04/2024
С Турцией еще не достигнуто соглашение о новых объемах транзитного газа в Европу – Алиев
Azerbaijan

60 bcm of Azerbaijani gas have been pumped through the TANAP gas pipeline

27/03/2024
WTI Crude Price
Brent Crude Price

Vacancy

International company is looking for a Lead Structural Engineer

19/08/2026
Vacancy

International company is looking for a Project Director

18/08/2026
Vacancy

International company is looking for a Survey Lead

18/08/2026
Vacancy

International Company is looking for a Project Manager

29/07/2026
Vacancy

International Company is looking for a Team lead

29/07/2026
Kateqoriyasız

EnerMech OGP is looking for a Crane Operator 

27/07/2026
Vacancy

PD&MS Group is looking for a Construction Delivery Lead (Baku)

27/07/2026
Azerbaijan

GL Group Appoints Farid Baghirov as Group Vice-President of Commercial and Business Development

23/07/2026
Azerbaijan

GL Group Announces Establishment of U.S. Presence and Appointment of Executive Vice President, North America

23/07/2026
Azerbaijan

GL Group Signs Strategic Cooperation Services Agreement with Baker Hughes

23/07/2026

No Result
View All Result
  • Azərbaycan
  • English
  • Русский
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • Contact

© 2014 - 2024 CaspianBarrel - Xəzərin neft və qaz xəbələri.