Wednesday, February 11, 2026
Caspian Barrel
Advertisement
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • About Us
  • Azərbaycan
  • English
  • Русский
No Result
View All Result
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • About Us
  • Azərbaycan
  • English
  • Русский
No Result
View All Result
Caspian Barrel
No Result
View All Result

ICGB selects insurer for gas connector with Greece

19/06/2019
ICGB opened publicly the submitted offers in the tender for construction of the interconnector with Greece
2
VIEWS
Share on FacebookShare on Twitter

The project company ICGB announced a tender for the selection of the leading insurer for the project “Gas Interconnector Greece – Bulgaria”.

The leading insurer shall cover for all insurance risks (Construction All-Risk or CAR insurance), in particular ICGB will conclude insurance policy for:

  • Construction All Risks (CAR)
  • Delay in Start Up (DSU)
  • Third Party Liability (TPL)

The coverage of those risks is organized by the Contracting Entity and it is outside the mandatory insurances that each of the contractors must provide under the legislation in Bulgaria and Greece. The estimated value of the procurement is EUR 1 300 000 which is the maximum premium to which the candidates may submit offers.

The procedure is organized as a negotiation with an initial notice for participation and in the first phase requests for participation can be submitted by all interested candidates who meet the selection criteria and for which there are no grounds for exclusion under the Public Procurement Act and the contract notice. Only candidates who have passed the pre-selection will be invited to submit initial offers to the second phase.

The public procurement is implemented as part of the risk management measures that the project company performs and is in compliance with the international practices, as it aims to provide coverage in the event of adverse events accompanying the construction, testing and commissioning (except the mandatory insurances for the constructor, the designers and other participants in the construction), which will be provided under the contracts concluded with them.

The deadline for submission of requests for participation is 15.07.2019. More information may be found in the dossier of the public procurement in the section called Buyer’s profile at the following link: https://www.icgb.eu/buyers-profile/selection-of-a-leading-insurer-for-gas-interconnector-greece-bulgaria-project/

Caspian Barrel

Tags: Greece - BulgariaICGB

Related Posts

Testing of the gas metering station of IGB has been completed successfully
İnteresting News

ICGB announces anticipated time for capacity expansion

06/02/2024
WTI Crude Price
Brent Crude Price

Vacancy

International company is looking for a Project Fabrication Manager

05/02/2026
Vacancy

International company is looking for a Project Surveyor

05/02/2026
Vacancy

International company is looking for a Well Test Data Acquisition Engineer

07/02/2026
Vacancy

International company is looking for a Well Test Data Acquisition Supervisor

07/02/2026
Vacancy

International company is looking for a SLICKLINE SPECIALIST

07/02/2026
Vacancy

International company is looking for a Field Specialist

07/02/2026
Vacancy

International company is looking for a SIS Account Manager

07/02/2026
Vacancy

International company is looking for a WEC Drilling Product Engineer AZT and KZU

07/02/2026
Vacancy

International Company is looking for a PSD MANAGER PRODUCTION CHEMISTRY

07/02/2026
Vacancy

International company is looking for a CUTTINGS RE-INJECTIONS LEAD ENGINEER

07/02/2026

No Result
View All Result
  • Azərbaycan
  • English
  • Русский
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • Contact

© 2014 - 2024 CaspianBarrel - Xəzərin neft və qaz xəbələri.