Friday, August 14, 2026
Caspian Barrel
Advertisement
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • About Us
  • Azərbaycan
  • English
  • Русский
No Result
View All Result
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • About Us
  • Azərbaycan
  • English
  • Русский
No Result
View All Result
Caspian Barrel
No Result
View All Result

93% of TAP route in Greece and Albania cleared

13/03/2018
TAP layihəsinin 60%-dən çoxu icra edilib
23
VIEWS
Share on FacebookShare on Twitter

93% of route of Trans Adriatic Pipeline (TAP), which will transport Azerbaijani gas to Europe, in Greece and Albania, was cleared.

Report informs citing the TAP official website.

According to information, it means 710 km out of 765 km of the pipeline in the two countries.

Notably, TAP, which is a part of Southern Gas Corridor project, will initially transport annual 10 bln cubic meters of the gas produced within ‘Shah Deniz 2’ project, to Europe. This pipeline will join TANAP (Trans Anatolian) pipeline in Kipoi territory on Turkey-Greece border and cross Greece, Albania and the Adriatic Sea before going onshore in southern Italy.

After reviewing various selection options during two years, on June 28, 2013, ‘Shah Deniz’ Consortium has officially declared selection of the TAP project. The pipeline is 878 kilometers long, 550 km of which will cover Greece, 215 Albania, 105 Adriatic Sea and 8 km Southern Italy. Highest point of the pipeline will be in the mountains of Albania (1 800 meters), the lower part (-820 meters) beneath the sea.

TAP’s groundbreaking ceremony was held in Thessaloniki, Greece on May 17, 2016. Azerbaijani gas will be delivered to Europe in 2020.

BP (20%), SOCAR (20%), ‘Snam S.p.A.’ (20%), ‘Fluxys’ (19%), ‘Enagas’ (16%) and ‘Axpo’ (5%) companies acting as TAP shareholders.

93% of route of Trans Adriatic Pipeline (TAP), which will transport Azerbaijani gas to Europe, in Greece and Albania, was cleared.

Report informs citing the TAP official website.

According to information, it means 710 km out of 765 km of the pipeline in the two countries.

Notably, TAP, which is a part of Southern Gas Corridor project, will initially transport annual 10 bln cubic meters of the gas produced within ‘Shah Deniz 2’ project, to Europe. This pipeline will join TANAP (Trans Anatolian) pipeline in Kipoi territory on Turkey-Greece border and cross Greece, Albania and the Adriatic Sea before going onshore in southern Italy.

After reviewing various selection options during two years, on June 28, 2013, ‘Shah Deniz’ Consortium has officially declared selection of the TAP project. The pipeline is 878 kilometers long, 550 km of which will cover Greece, 215 Albania, 105 Adriatic Sea and 8 km Southern Italy. Highest point of the pipeline will be in the mountains of Albania (1 800 meters), the lower part (-820 meters) beneath the sea.

TAP’s groundbreaking ceremony was held in Thessaloniki, Greece on May 17, 2016. Azerbaijani gas will be delivered to Europe in 2020.

BP (20%), SOCAR (20%), ‘Snam S.p.A.’ (20%), ‘Fluxys’ (19%), ‘Enagas’ (16%) and ‘Axpo’ (5%) companies acting as TAP shareholders.

Tags: BPSOCARSouthern Gas CorridorTANAPTAPШах-Дениз\

Related Posts

SOCAR completes acquisition of Italiana Petroli
Kateqoriyasız

SOCAR completes acquisition of Italiana Petroli

12/05/2026
Abşeron Yatağının Tammiqyaslı İşlənməsi Layihəsi üçün ƏMSSTQ-nin açıqlanması
Azerbaijan

ESIA Disclosure for Absheron Full Field Development

16/03/2026
SOCAR President: Azerbaijan reinforces its position as regional energy hub
Azerbaijan

SOCAR President: Azerbaijan reinforces its position as regional energy hub

14/03/2026
SOCAR ADNOC ilə “Abşeron” yatağının tammiqyaslı işlənmə layihəsini müzakirə edib
Azerbaijan

SOCAR, ADNOC discuss full-field development of Absheron gas-condensate field

21/01/2026
Azərbaycan qazının Avropa bazarlarına çıxarılmasının beş ili
Azerbaijan

The first five years of Azerbaijani gas in European markets

19/12/2025
С начала года по ВТС прокачено 4,8 млн тонн центрально-азиатской нефти
Azerbaijan

BP in talks to transfer pipeline operator role to Azerbaijan, Georgia, and Türkiye

08/12/2025
Please login to join discussion
WTI Crude Price
Brent Crude Price

Vacancy

International Company is looking for a Project Manager

29/07/2026
Vacancy

International Company is looking for a Team lead

29/07/2026
Kateqoriyasız

EnerMech OGP is looking for a Crane Operator 

27/07/2026
Vacancy

PD&MS Group is looking for a Construction Delivery Lead (Baku)

27/07/2026
Azerbaijan

GL Group Appoints Farid Baghirov as Group Vice-President of Commercial and Business Development

23/07/2026
Azerbaijan

GL Group Announces Establishment of U.S. Presence and Appointment of Executive Vice President, North America

23/07/2026
Azerbaijan

GL Group Signs Strategic Cooperation Services Agreement with Baker Hughes

23/07/2026
Azerbaijan

Historic Milestone: GL Group Becomes the First Azerbaijani Company to Acquire Four Oil and Gas Assets in the United States

23/07/2026
Vacancy

Wood Nobel Energy is looking for an Engineering Manager

27/07/2026
Vacancy

PD&MS Group is looking for a Senior Project Engineer

14/07/2026

No Result
View All Result
  • Azərbaycan
  • English
  • Русский
  • Azerbaijan
  • Russia
  • Kazakhstan
  • Turkmenistan
  • Iran
  • İnteresting News
  • Green energy
  • Vacancy
  • Contact

© 2014 - 2024 CaspianBarrel - Xəzərin neft və qaz xəbələri.